Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

May 09, 2023     40-6 Flap System step 1-4 New Actuator - (2 hours)       Category: Fuselage
Routing of the flap actuator cable. After a little thinking i decided to use a CPC flange connector and to use click-bond studs and click-floating nut to route the cable towards the right side of the plane.
Initially i wanted to enlarge the tooling hole but the position is not right as there is some interference with the will extended flaps. I drilled a second hole in a more convenient position and i enlarged to measure. Test fitting with no interference.
Installation of click-bond is fairly easy.


 